Today was the 'Official Start Date' and true to their word, Henley got started. The pictures may look very much like the previous ones, causing you to think "what work?" but if you look closely, you can see where the site was cut on the left side and where the extra fill was brought in to make the lot level on the right side. You may also notice that a square section at the front of the lot is slightly lower than the rest, which is due to the design. This is where the double garage will be built and will be 170mm (that's about 6.5 inches) lower than the rest of the house. The same is true of the Alfresco in the back right corner, but you probably can't tell from the pic's. Hopefully more to come tomorrow and over the next week, leading up to the pouring of the foundation!